ZY Cleanroom - specification text for tenders. Fill the brackets. Describes the item by function, not by brand. https://www.zycleanroom.com/products/cleanroom-doors/ CLEANROOM DOORS 1 GENERAL 1.1 Scope: supply [and install] cleanroom door assemblies (leaf, frame, seals, glazing, hardware [and operators]) to the door schedule, drawing [ref, rev]. 1.2 Submittals: door schedule with clear passage, construction opening and external frame size for each door mark; frame section and fixing detail for each wall type; leaf build-up; hardware list; [leak test data for hermetic doors]; [fire test report for the complete assembly where a rating is scheduled]; installation instructions. 1.3 The supplier returns a dimensioned opening detail for approval before manufacture. Openings are not derived from the clear passage by a standard allowance. 2 PRODUCTS 2.1 Leaf: [50] mm thick, faces [colour-coated galvanized steel / stainless steel grade ( ) / HPL], core [rock wool / aluminium honeycomb / paper honeycomb], edges sealed; stainless edges welded and ground. 2.2 Frame: [steel / stainless steel / aluminium], profile matched to the [50 / 75 / 100] mm panel wall or to the measured masonry wall; fixed flush with the wall face on the clean side. 2.3 Surfaces: smooth, impervious, without ledges or recesses that cannot be cleaned; resistant to [cleaning agents, concentration, frequency]. 2.4 Vision panel: double-glazed, flush with the leaf on [one / both] faces, [rounded / square] edges, size and position per door drawing. 2.5 Hermetic doors (where scheduled): [sliding / swing], [manual / automatic]; perimeter seals and bottom seal for a closed-door leakage not exceeding [ m3/h at Pa] / [class to EN 12207], tested on the complete door. 2.6 Automatic doors (where scheduled): activation [hands-free sensor / foot / elbow / push button / card]; obstruction detection; behaviour on power loss [stay closed / open / free to push]; emergency release on [fire alarm signal]; top-hung track, no floor track. 2.7 Hardware: [closer sized for Pa / lever handle / lock / drop seal / access control] per door schedule. 2.8 Interlocks (where scheduled): doors [marks] interlocked so that only one opens at a time; delay [ s]; status light each side; emergency override. 3 EXECUTION 3.1 Install after wall panels and corners, before lights and filters. 3.2 Frames plumb, square and flush; sealed to the wall all round on both faces. 3.3 Check: swing or travel, closing, seals, interlock function and emergency release; record per door mark.