ZY CLEANROOM — STEEL TRUSS FLOOR DECKING ENQUIRY PLANNING WORKSHEET Company / contact / email: Destination country / city: Complete known requirements; mark unresolved items “To be confirmed”. This worksheet is not a structural calculation, approved design or product certificate. 1. Floor / level / drawing reference and revision Answer: 2. Panel or member mark / quantity / measurement unit Answer: 3. Panel cut length and separate support/span schedule Answer: 4. Panel direction, openings and edge details Answer: 5. Truss geometry and reinforcement grade: specified or To be confirmed Answer: 6. Base-sheet profile / thickness basis / coating specification Answer: 7. Connection and fixing details for review Answer: 8. Floor design information supplied by the project designer Answer: 9. Temporary supports and installation sequence requirements Answer: 10. Required product drawings, reports and acceptance documents Answer: 11. Design / fabrication / installation responsibility Answer: 12. Packing, unloading and requested programme Answer: Send with drawings to info@zycleanroom.com. Final drawings, product specifications, quantities and supply scope require confirmation.