Agricultural storage building enquiry checklist Complete the project brief and email it with drawings to info@zycleanroom.com. Mark unknown details To confirm. This sheet records requirements; it does not approve a building design or confirm offered specifications. 1. Company / project reference / destination and site location: To confirm 2. Stored goods / storage method / target capacity and units: To confirm 3. Building footprint / required clear height / drawing revision: To confirm 4. Required clear door openings / vehicles or loads / access routes: To confirm 5. Loading and unloading areas / handling layout: To confirm 6. Conveyors, hoppers, racks or other equipment / dimensions and interface drawings: To confirm 7. Storage conditions / ventilation, temperature or insulation requirements: To confirm 8. Structural design brief / responsible designer / required project design inputs: To confirm 9. Supply boundaries: frame, roof, walls, doors, accessories and equipment: To confirm 10. Foundation, floor, services and installation responsibilities / required documents / requested delivery arrangements: To confirm