ZY Cleanroom — Honeycomb & Corrugated Composite Panels Use this worksheet with the panel schedule and project drawings. It records quotation inputs, not an approved design, performance report or product certificate. Mark unknown items for confirmation. The quotation identifies the offered configuration, supply scope and delivery programme. 1. Company, contact name and business email: 2. Project location, destination country and intended application: 3. Drawing revisions, panel marks, elevations and installation orientation: 4. Selected composite panel category and requested supply boundaries: 5. Overall and installed module dimensions, cut sizes, quantities and units: 6. Requested metal or alloy grade, thickness basis and finish for each face: 7. Requested overall thickness and honeycomb or corrugated core configuration: 8. Core geometry, orientation and proposed face-to-core bonding information where required: 9. Folds, returns, edge closures, corners, curves and openings: 10. Finish reference, sample approval scope and responsible party: 11. Support positions, spans and applicable designer-provided loads and movement requirements: 12. Proposed brackets, rails, fasteners and connection selection and approval responsibility: 13. Joints and interfaces with adjacent walls, roofs or ceilings as applicable: 14. Project-required complete-assembly documents, mounting conditions and acceptance criteria: 15. Included and excluded forming, accessories, site cutting, installation and handover responsibilities: 16. Panel identification, packing, unloading, handling, storage and requested delivery programme: Unknown details: To confirm