ZY Cleanroom — BIPV, BAPV & Solar Mounting Systems Use this worksheet with the roof or site drawings and the actual module mounting instructions. It records quotation inputs, not an approved structural or electrical design, roof assessment, electricity-yield estimate, performance report or product certificate. Mark unknown details for confirmation. The quotation identifies the offered component configuration, supply scope and delivery programme. 1. Company, contact name and business email: 2. Project location, destination country and roof or ground-mounted application: 3. Project drawings, revision, building or site reference and proposed module layout: 4. Requested BIPV building function or BAPV mounting arrangement: 5. Existing or new roof construction, profile, materials and available condition records: 6. Roof or ground-support positions, levels and foundation interfaces where applicable: 7. Actual module dimensions, quantity and manufacturer mounting instructions: 8. Permitted module fixing zones and proposed clamp, rail or bracket interfaces: 9. Component marks, dimensions, quantities and measurement units: 10. Requested component materials, grades, protective finishes and exposure conditions: 11. Designer-provided loads, load cases, reference conditions and fixing requirements: 12. Structural review, compatibility and approval responsibilities: 13. Roof joints, proposed penetrations, drainage and weatherproofing interfaces: 14. Access, cable-routing interfaces and applicable installation-stage requirements: 15. Required drawings, applicable inspection or test documents and acceptance responsibilities: 16. Included and excluded mechanical, module, electrical, foundation and site-work scope, packing and requested delivery programme: Unknown details: To confirm