CLEANROOM CEILING ENQUIRY WORKSHEET 1. Company / contact / email / project reference: 2. Destination country and city / quantity or area / requested programme: 3. Selected ceiling type: T-grid / I-grid / concealed Z-grid / FFU grid / thermal-break option / to confirm: 4. Room plan and reflected ceiling plan / drawing revision / dimensions and units: 5. Ceiling height / plenum height / module layout / panel and grid dimensions: 6. Panel composition / thickness / faces / grid material and finish / cleaning compatibility: 7. Support structure / suspension arrangement / spacing and fixing details / responsible structural designer: 8. Required imposed loads / equipment loads and locations / load combinations and applicable verification: 9. Maintenance above or below ceiling / access points / walk-on requirement if any / approved access arrangements: 10. FFU and filter housing schedule / opening and external dimensions / sealing and support interfaces: 11. Lighting and other service schedule / opening dimensions / access and connection responsibilities: 12. Panel joints / grid seals / wall junctions / penetrations and compatibility requirements: 13. Thermal-break use if needed / room and adjacent conditions / condensation-control design responsibilities: 14. Supply-only or coordinated package / included equipment and components / installation and site connections: 15. Required drawings, assembly evidence and test reports / factory versus site acceptance / packing and spares: Unknown details: To confirm Define the ceiling layout, supports, equipment openings, loads and maintenance access. A photograph does not prove load capacity or permission to walk on a ceiling. Confirm the specific assembly, design and acceptance responsibilities in the quotation. Edited requirements are kept when changing language.