Published · 2026-10-10 Prepare a span-table clarification request 1. Project, destination and floor-area reference: ____________________ 2. Drawing number and revision: ____________________ 3. Offered profile drawing and revision: ____________________ 4. Steel grade, thickness and thickness basis: ____________________ 5. Slab and concrete inputs supplied by the designer: ____________________ 6. Support layout, bearing width with units and definition of span: ____________________ 7. Single or continuous arrangement stated by the bidder: ____________________ 8. Propping assumption and approval-document reference: ____________________ 9. Construction-stage load definition and units: ____________________ 10. Completed-floor load definition and units: ____________________ 11. Fire and deflection checks required for this project: ____________________ 12. Table page, row or calculation revision: ____________________ 13. Requested input versus bidder’s stated input: ____________________ 14. Unresolved difference, reviewer and response date: ____________________ 15. Included/excluded supply and temporary-work scope: ____________________ Use the existing floor-deck Schedule/Project workbook for quantities and project information. The additional comparison worksheet records evidence and questions; it does not calculate capacity. The responsible designer must confirm the offered system and applicable project requirements. Installation, concrete placement and temporary-support decisions need the approved project documents. Manufacturer guidance is used to frame document-review questions. No manufacturer’s model, numerical span, load, certificate or supply capability is attributed to ZY. This is a buying guide, not installation instructions.