Industrial filtration and noise-control enquiry checklist Send the completed brief and drawings to info@zycleanroom.com. Mark unknown items To confirm. This worksheet records requirements; it is not an approved system design or performance certificate. 1. Company, project reference, site and destination: To confirm 2. Application: turbine inlet filtration / exhaust noise control / dust collection: To confirm 3. Equipment reference, process description and operating schedule: To confirm 4. Substance or gas/dust description and available project data: To confirm 5. Emission sources, capture positions and drawing revisions: To confirm 6. Required flow with units: branch, machine or total system: To confirm 7. Pressure requirement and corresponding operating conditions: To confirm 8. Temperature and other relevant process conditions: To confirm 9. Connection dimensions, footprint and service access: To confirm 10. Acoustic brief and requested measurement conditions, if applicable: To confirm 11. Component scope: filters, collectors, fans, ducts, controls and supports: To confirm 12. Design, installation, commissioning, acceptance and maintenance responsibilities: To confirm