LIGHT GAUGE STEEL BUILDING ENQUIRY WORKSHEET 01. Company, project reference, destination, intended building use, occupancy and requested storeys: To confirm 02. Plans, elevations, sections, levels and roof geometry; drawing revisions and approval status: To confirm 03. Responsible design contact, project design criteria and supplied load information; load-bearing or infill frame scope and design responsibilities: To confirm 04. Member or framing-panel marks, sections, quantities and units; requested steel material, grade, thickness basis and coating for review: To confirm 05. Bracing, ties and connection details; fixing schedule and connection-design responsibilities: To confirm 06. Foundation and anchorage drawings, reactions supplied by the designer, support tolerances and interfaces to other construction: To confirm 07. Roof, wall and floor layer schedules; requested membranes, insulation continuity, moisture-control and junction details where applicable: To confirm 08. Thermal, fire or acoustic requirements where specified; documents applicable to the selected complete configuration and review or acceptance responsibilities: To confirm 09. Door, window and other opening schedules; supporting members, frames, glazing requirements and junction details: To confirm 10. Service penetrations, equipment attachments and wet-area interfaces; proposed details requiring coordination: To confirm 11. Requested electrical, water, drainage or ventilation supply scope; connection points, drawings and work by others: To confirm 12. Exterior and interior finish schedules; exposure, corrosion protection and compatibility at material interfaces: To confirm 13. Requested loose material, fabricated panel or module format; fabrication, included components and installation boundaries: To confirm 14. Material records, fabrication and inspection documents, traceability, fixing quantities and project acceptance requirements: To confirm 15. Packing, transport, unloading and storage constraints; installation sequence, temporary stability and weather-protection responsibilities: To confirm 16. Requested programme, destination delivery scope, inclusions and exclusions; unresolved selections and responsibilities: To confirm Use the same project reference and coordinated drawing revisions when comparing building packages. Identify the responsible designer and the load-bearing or infill scope. Request member, connection, foundation and complete roof/wall/floor schedules; state thermal, fire or acoustic criteria only where specified and ask for applicable configuration documents. Distinguish materials, fabricated panels, modules, services and site work, including temporary stability, weather protection and acceptance responsibilities. Requested dimensions, material selections and delivery programmes require project review and quotation confirmation. This worksheet is not a structural calculation, approved design, construction plan or performance certificate. Your edited requirements are retained when switching language. info@zycleanroom.com