ZY Cleanroom — Membrane Roofing & Structural Roof Decks enquiry Use this worksheet with the roof build-up and structural drawings. It records quotation inputs, not a structural design, waterproofing approval, compatibility report or product certificate. Mark unknown items for confirmation. The quotation identifies the offered configuration, supply scope and delivery programme. 1. Company, contact name and business email: 2. Project location, destination country and building use: 3. Roof plan, sections, drawing revisions and deck marks: 4. Selected deck or roof assembly category and requested supply boundaries: 5. Actual profile section, overall and cover widths, cut lengths, quantities and units: 6. Requested metal grade, thickness basis and finish on each deck face: 7. Support positions, spans, bearing widths, connections and openings: 8. Designer-provided load cases, movement, deflection and installation-stage requirements: 9. Requested deck, vapour-control or separation layers and their order: 10. Requested insulation, any cover board, materials and thicknesses: 11. Requested membrane type and attachment components for the deck, insulation and membrane: 12. Project-required edge and corner zone details; component selection and approval responsibility: 13. Roof falls, drains, outlets, upstands, parapets and penetration drawings: 14. Applicable complete-assembly documents, compatibility checks, inspections and acceptance criteria required by the project: 15. Factory-assembled and site-installed items; included and excluded accessories, design, installation and handover responsibilities: 16. Packing, unloading, storage, maintenance access and requested delivery programme: Unknown items: To confirm