Keep a delivery-condition and discrepancy record Connect each observation to a package identifier and the panel schedule. Record what was visible, when it was checked and which items remain uninspected; a package count does not confirm the condition or specification of every panel. Procurement record only. It does not authorise unloading, installation, repair or acceptance. Use the actual supplier instructions and agreed project process; do not copy another manufacturer’s numerical handling limits or reporting terms. 1. Project, supplier, order and delivery reference: 2. Destination and observation date, time and time zone: 3. Package identifier, panel marks and schedule revision: 4. Expected and received package counts; items not yet counted: 5. Ordered panel description, dimensions and units for identification: 6. Visible packaging condition and when it was observed: 7. Visible panel condition and limits of safe visual access: 8. Overview, identifier and close-up photo filenames: 9. Affected quantity and unit; measured, estimated or unchecked: 10. Inspection scope and contents or surfaces not inspected: 11. Delivery-document reference and recorded discrepancy: 12. Observer and responsible technical or supply reviewer: 13. Agreed notification route, recipient and sent-reference/time: 14. Written supplier response, review status and next responsible person: Ruukki illustrates documenting packaging or product damage with delivery records and photographs. Kingspan’s ems guide also addresses receipt checks and visible transport defects. These are manufacturer examples, not ZY handling limits or contract conditions. https://www.ruukki.com/docs/default-source/b2b-documents/sandwich-panels/installation-instruction-for-sandwich-panels.pdf?sfvrsn=72639016601564500000 https://damcdn.kingspan.com/assets/product/public/original/ASS_1035314.pdf