SPECIALIST CLEANROOM WINDOW ENQUIRY WORKSHEET Product: Specialist Cleanroom Windows 1. Company / contact / email / project and window references: 2. Destination country and city / quantities by window mark / requested programme: 3. Selected configuration / fixed, opening or switchable glazing / required operating brief: 4. Opening schedule and drawing revision / structural opening width and height / units: 5. Required viewing area / frame dimensions / partition thickness and supporting construction: 6. Glazing build-up / pane thicknesses, glass treatment and safety requirements to confirm: 7. Frame materials, finish and flush alignment / frame fixing and panel-joint interfaces: 8. Glass-edge treatment, seals and fixings / assembly compatibility and cleaning access: 9. For opening windows: opening direction, moving-part clearance / actuator or manual hardware / access for service: 10. For privacy glazing: required visual states and viewing conditions / required power-loss behaviour: 11. Electrical supply interface / controller, transformer, wiring and control locations / equipment scope: 12. Operating and access controls / installation, electrical connection and commissioning responsibilities: 13. Cleaning agents, concentration, contact time and frequency / temperature, humidity and decontamination conditions: 14. Required fire, leakage or other performance criteria if specified / complete assembly evidence / permitted sizes, supporting wall and installation conditions: 15. Supply-only or coordinated installation / inspection, acceptance and maintenance instructions: 16. Packing, spares, documentation and requested delivery schedule / unresolved details to confirm: Unknown details: To confirm Record the structural opening and required viewing area separately. Specify the offered glazing, frame, seals and controls, cleaning conditions and supply scope. Fire, leakage or other performance requirements need applicable evidence for the complete assembly and installation conditions; a category or catalogue image does not establish them. Privacy, blackout and solar control are different requirements. Confirm electrical connection, installation, commissioning and acceptance responsibilities. Edited requirements are kept when changing language.