ZY CLEANROOM STEEL BUILDING STRUCTURE ENQUIRY WORKSHEET Use the same project reference, drawing revision and member schedule when comparing offers. State the responsible project designer, supplied design/load criteria, connection and foundation interfaces, protective-treatment requirements and package boundaries. Fire protection applies only where specified; request the applicable project documentation. Confirm fabrication, inspection, packing, delivery, erection planning, temporary stability and acceptance responsibilities. This enquiry worksheet is not a structural calculation, approved design, certificate or erection plan. Edited requirements are kept when changing language. 1. Company / contact / email / project references Answer: 2. Destination country and site location / building use / requested programme Answer: 3. Plans and elevations / building dimensions / grid / drawing revision and approval status Answer: 4. Responsible project designer / applicable design basis and supplied load criteria Answer: 5. Primary frame and bracing arrangement / secondary members / design responsibility Answer: 6. Member marks / sections / material requirements / lengths / quantities and units Answer: 7. Connection drawings / bolt, weld and fixing requirements / fabrication interfaces Answer: 8. Foundation reactions, anchor interfaces and site tolerances to be provided or confirmed Answer: 9. Crane, mezzanine, equipment, large opening or future-extension requirements if relevant Answer: 10. Purlin, roof, wall, floor-deck and opening schedules / inclusion and exclusion boundaries Answer: 11. Surface preparation and corrosion-protection requirements / specified exposure conditions Answer: 12. Fire-protection requirements if specified / compatibility and project documentation Answer: 13. Required material, fabrication and inspection documents / traceability and acceptance scope Answer: 14. Packing, transport, unloading, lifting and requested delivery sequence Answer: 15. Erection planning, temporary stability, site works and acceptance responsibilities Answer: 16. Requested supply scope, quotation assumptions and unresolved items to confirm Answer: Unknown details: To confirm info@zycleanroom.com