ZY Cleanroom — Truss & H-Section Purlins Use this worksheet with the framing drawings and member schedule. It records quotation inputs, not a structural calculation, approved design, capacity report or product certificate. Mark unknown details for confirmation. The quotation identifies the offered member construction, supply scope and delivery programme. 1. Company, contact name and business email: 2. Project location, destination country and roof or wall application: 3. Drawing references, revisions and member marks: 4. Requested truss, H-section or I-section member construction: 5. Member geometry, section dimensions and fabrication drawings: 6. Member cut lengths, quantities and measurement units: 7. Designer-provided support positions, spans and member spacing: 8. Specified steel grades and material records: 9. Specified protective finish, preparation and repair requirements: 10. Designer-provided permanent and installation-stage requirements: 11. Specified suspended services or concentrated loads and interface locations: 12. End bearings, cleats, plates, holes, fasteners and specified weld details: 13. Bridging, restraint and temporary-stability requirements; design and approval responsibilities: 14. Required material, fabrication, welding, finish and inspection documents: 15. Included and excluded parts, fabrication, erection, site modifications and temporary works: 16. Member-mark packing, unloading, storage and requested delivery programme: Unknown details: To confirm