ZY CLEANROOM - TRUSS & H-SECTION PURLINS DRAWING-BASED ENQUIRY WORKSHEET Company / contact / email: Complete one schedule line per member mark. Attach the referenced drawings. Keep cut lengths and design spans in separate drawing fields. Mark unresolved items "To confirm". C/Z member dimensions do not specify a truss or H-section assembly. 1. Project location / building use / roof or wall framing zone Answer: 2. Drawing number / revision / units / design contact Answer: 3. Member mark / selected H-section, I-section or truss configuration Answer: 4. Section dimensions or truss geometry / referenced fabrication drawing Answer: 5. Member cut length / quantity / units / orientation Answer: 6. Steel material requirements / surface preparation / protective finish Answer: 7. End connections / plates / cleats / bolt and hole drawings Answer: 8. Bridging and restraint members / locations / associated part quantities Answer: 9. Supporting steelwork / bearing and connection interfaces Answer: 10. Roof or wall panel interfaces / openings / service coordination Answer: 11. Project-supplied design criteria / load information / approval responsibilities Answer: 12. Required fabrication and inspection documents / supply, packing, transport and erection scope Answer: Send with drawings to info@zycleanroom.com. This is an enquiry worksheet, not a structural calculation, approved substitution or certificate. Offered specifications, quantities, design responsibility and delivery scope require confirmation.