ZY Cleanroom — Steel Truss Floor Decking Use this worksheet with the floor drawings and panel schedule. It records quotation inputs, not a structural calculation, approved floor design, performance report or product certificate. Mark unknown details for confirmation. The quotation identifies the offered assembly, supply scope and delivery programme. 1. Company, contact name and business email: 2. Project location, destination country and intended floor application: 3. Floor levels, drawing references, revisions and panel marks: 4. Requested truss-deck category and base-sheet arrangement: 5. Panel cut lengths, installed module widths, quantities and measurement units: 6. Separate support positions, bearing details and designer-provided span schedule: 7. Requested truss geometry, reinforcement grades and reinforcement details: 8. Base-sheet material, profile, thickness basis and coating requirements: 9. Proposed truss-to-sheet connection and permanent or removable base-sheet scope: 10. Proposed concrete build-up and designer-specified additional reinforcement: 11. Construction-stage and completed-floor requirements supplied by the designer: 12. Temporary propping, installation and pouring sequence; approval and removal responsibilities: 13. Openings, edges, adjoining construction and proposed connections for review: 14. Required assembly drawings, material, fabrication, test and acceptance documents: 15. Included and excluded accessories, temporary works, site cutting, repairs and installation responsibilities: 16. Panel identification, packing, unloading, lifting, storage and requested delivery programme: Unknown details: To confirm