Country guide: Spain
Cleanroom contractor in Spain: rules for buyers
In Spain the Spanish Agency of Medicines and Medical Devices (AEMPS) authorises the owner's pharmaceutical laboratory, not the contractor. AEMPS has been a PIC/S participating authority since January 1998.
By ZY Cleanroom · Updated · Sources at the end of the page
Which rules apply to your facility
Royal Decree 824/2010 of 25 June regulates pharmaceutical laboratories. Article 5.1 says manufacturers must be authorised in advance by AEMPS. Article 6 requires the applicant to have adequate and sufficient premises, technical equipment and control equipment, and article 26.1 requires manufacturing and control operations to follow good manufacturing practice (Real Decreto 824/2010, text).
For hospitals, the Spanish standard UNE 171340:2020, on validation and qualification of controlled environments in hospitals, was released on 29 July 2020 and is listed as in stock (EN-Standard listing, checked 1 November 2026). In Spanish the rooms are called salas limpias or salas de ambiente controlado, so use both terms when you brief suppliers.
| Facility | Rule |
|---|---|
| Pharmaceutical laboratory | AEMPS authorisation, Real Decreto 824/2010 article 5.1 |
| Premises and equipment | Article 6: adequate and sufficient |
| Hospital controlled environments | UNE 171340:2020 |

Who builds cleanrooms here
Pharmaceutical laboratories applying for AEMPS authorisation are the regulated buyers, because article 6 ties the authorisation to premises and equipment. Hospitals are the second group, because UNE 171340 addresses their controlled environments. This reading comes from the rules, not from market statistics.
What a foreign supplier must arrange
The EU Construction Products Regulation, Regulation (EU) 2024/3110, entered into force on 7 January 2025 and became generally applicable on 8 January 2026 (DIBt). For self-supporting double-skin metal insulating panels, CE marking is compulsory under EN 14509 (Tecnalia, 6 June 2023). A panel supplier from outside the EU should therefore expect to be asked for CE marking and a declaration of performance for each product. Agree with the owner who places the panels on the market.
What to send for a first scope
Send the room list with the ISO 14644-1 class and occupancy state for each room. Add floor plans and ceiling heights. State whether the rooms are for a pharmaceutical laboratory or a hospital, whether they are sterile, and which UNE edition the hospital works to. Name the autonomous community.
Send your room list to ZY Cleanroom, a cleanroom design-and-build contractor with its own panel factory in Tianjin, China, to have a first scope prepared. CE-marked and FM-approved panels can be supplied for projects that require them, and other certification can be arranged per project.
Who does the site work
Site work is delivered with a licensed local contractor: yours, or one named in the contract. ZY supplies the design, panels, doors and numbered drawings.
Questions
Common questions
Does AEMPS approve cleanroom contractors?
No. AEMPS authorises the owner's laboratory. The owner chooses and manages the contractor.
Which article requires prior authorisation?
Article 5.1 of Real Decreto 824/2010 says manufacturers must be authorised in advance by AEMPS.
Which Spanish standard covers hospital controlled environments?
UNE 171340:2020, validation and qualification of controlled environments in hospitals, released on 29 July 2020.
Is Spain a PIC/S member?
Yes. PIC/S lists AEMPS with accession to the scheme in January 1998 (PIC/S, checked 1 November 2026).
Related guides
- Cleanroom cost per m²: published ranges by ISO class
- What a cleanroom costs to run: energy, filters and testing
- How long does it take to build a cleanroom?
- How to audit a cleanroom panel factory, on site or by video
- Turnkey cleanroom contractor
- Room list builder
Sources
- Real Decreto 824/2010, de 25 de junio, text (checked 1 November 2026)
- EN-Standard, UNE 171340:2020, released 2020-07-29 (checked 1 November 2026)
- DIBt, revised Construction Products Regulation (EU) 2024/3110: in force 7 January 2025, generally applicable 8 January 2026
- Tecnalia, Insulating panels with CE marking according to EN 14509 (6 June 2023)
- PIC/S, list of participating authorities (checked 1 November 2026)
Project enquiry
Send what you have
A room list, a floor plan or only the floor area is enough to start. After you submit, send drawings by email or WhatsApp.
We reply by email within one working day. We can sign an NDA before you send drawings.
WhatsApp +44 7962 561184 is our UK number for export enquiries. The factory is in Tianjin, China.
Email: [email protected]
WhatsApp: +44 7962 561184