Buyer guide
Cleanroom Door Sizes and Specifications: What Goes in the Door Schedule
There is no cleanroom standard that sets a door size. Size each door from the largest person, trolley, bed or machine that must pass, then check it against local fire and building rules. Our typical cleanroom door openings are 900 × 2100 mm single (widths 900–1200 mm), 1500 × 2100 mm double and 1200 × 2100 mm unequal leaf, with other sizes made to drawing. A door specification needs four separate dimensions: clear passage, construction opening, external frame size and leaf size. It also needs the wall, the leaf build-up, the hardware and the pressure across the door.
By ZY Cleanroom · Updated · Sources at the end of the page
The four dimensions of a cleanroom door
| Dimension | What it means | What to record |
|---|---|---|
| Clear passage | The usable width and height with the door open in the agreed position | The size the largest item needs; ask how leaf, stops and hardware reduce it |
| Construction opening | The hole in the wall that receives the frame | The supplier's required width, height, allowance and tolerance |
| External frame size | The overall frame, measured on a stated face | Trims, the panels next to it and fixing positions |
| Leaf size | Each leaf; on a double door, which leaf is active | Active and inactive leaves and how each operates |
Keep the four as separate numbers with units. Do not work out the construction opening by adding a standard allowance to the clear passage: frame profiles, seals and thresholds differ between door models.

Typical sizes and how to choose yours
| Door | Typical opening |
|---|---|
| Single leaf | 900 × 2100 mm; widths 900–1200 mm |
| Double leaf | 1500 × 2100 mm |
| Unequal leaf | 1200 × 2100 mm |
| Other | Made to your drawing |
These are the openings we make most often, not a rule. Start from what has to pass. List the widest trolley, bed or machine on that route, including anything carried on it, and set the clear passage from that. An unequal-leaf door keeps a normal-width leaf for people and opens the second leaf only for equipment. Check the result against your local fire-escape and hospital building rules, which can set minimum widths for some rooms.
Worked example, one door from layout to schedule
This is an example entry for an enquiry, not a stock size.
| Field | Entry |
|---|---|
| Door mark and location | D-01, corridor to packaging room, drawing revision A |
| Type | Single-leaf swing; opening side shown on the plan |
| Clear passage | 900 mm wide × 2,100 mm high in the agreed open position |
| Construction opening | Supplier returns a dimensioned frame detail for approval |
| Wall | 50 mm panel wall; wall build-up from the panel drawing |
| Leaf | About 50 mm; stainless steel faces; rock wool core |
| Vision panel | Double-glazed, flush, rounded edges |
| Hardware | Closer, lever handle, lock, drop seal |
| Pressure across the door | From the HVAC design, Pa |
| Installed by | ZY or your contractor |
For an existing room, add the measured opening and photographs of the floor, wall edges and nearby obstructions. For a new room, agree which drawing controls the door and the panels before either is released for manufacture. Mark anything not yet decided "To confirm".
The door specification, line by line
A complete specification for each door mark covers:
- Type and operation: single, double or unequal-leaf swing; manual or automatic sliding; high-speed roller or impact door.
- Dimensions: the four dimensions above, with units.
- Wall: panel thickness or measured masonry wall with finishes.
- Frame: steel, stainless steel or aluminium.
- Leaf: thickness, face sheet and core.
- Vision panel: size, position and edge detail.
- Hardware: closer, handle, lock, seals, drop seal, access control.
- Pressure: the difference across the closed door and which side is higher.
- Leakage: the class and test pressure, if the project sets one. EN 12207:2016 grades internal pedestrian doorsets A to D; class D is 3 m³/(h·m²) at 100 Pa.
- Fire rating: only where needed, and for the complete tested door assembly, not the leaf core.
- Interlock group: which doors of an airlock must not open together.
- Finish and cleaning agents: the agents, concentration and frequency the finish must tolerate.
- Scope: who prepares the opening, who supplies, who installs.
Our leaves are about 50 mm thick, matched to the wall, with 0.5–1.2 mm colour-coated galvanized steel or stainless steel faces. The core is paper honeycomb, aluminium honeycomb, or rock wool where a non-combustible core is specified.
What the rules ask of doors in different rooms
The door schedule changes with the room. The table lists what each source says about doors, and the line it adds to the schedule.
| Room | What the source says | Add to the door schedule |
|---|---|---|
| Airlock into Grade A or B | Entry and exit doors should not open at the same time; an interlocking system should be used (EU GMP Annex 1, para 4.13) | Interlock group, time delay where segregation needs one, emergency release |
| Airlock into Grade C or D | A visual and/or audible warning system as a minimum (Annex 1, para 4.13) | Warning lights or buzzer; interlock only if the owner asks for it |
| Non-sterile pharmaceutical rooms | Swing doors should normally open to the high-pressure side and have self-closers (WHO TRS 1010, Annex 8, para 4.14) | Opening side on the plan; closer sized for the pressure |
| BSL-2 laboratory | Laboratory doors are self-closing and have locks in line with institutional policy (BMBL 6th edition) | Closer and lock type for each door mark |
| BSL-3 laboratory | Access through two consecutive self-closing doors; doors lockable; spaces around doors capable of being sealed for space decontamination (BMBL 6th edition) | Two door marks in series, closers, locks, and how the frame joint is sealed |
| Hospital pressurised and isolation rooms | Self-closing devices; no hold-open devices on doors that must stay closed; no door grilles or undercuts (Dubai Health Authority guidelines, sections 6.4 and 6.6) | Closer; no hold-open device; no grille or undercut |
| Patient bedrooms with bed access | Recommended minimum clear opening 1400 mm wide and 2140 mm high in new areas; not less than 1200 × 2040 mm in renovations (Dubai Health Authority guidelines, section 6.2) | Clear passage for the bed route |
These are the rules of the sources named, not of every country. Check the version your authority uses, and record the rule against each door mark so the reviewer can trace it. A laboratory door specification differs from a pharmaceutical one mainly in locks, the doors in series and sealing for decontamination. A hospital door specification adds bed clearance and the hardware rules for pressurised rooms.
Our doors can be made with an interlock interface and status lights for airlocks; the door schedule decides which door marks need them. See pass box and air shower interlocks.
Swing or sliding, and what changes in the plan
A swing door needs its swing arc drawn and its opening side shown on a labelled plan; "left-hand" or "right-hand" alone is read differently by different suppliers. WHO guidance for non-sterile products says swing doors should normally open to the high-pressure side and have self-closers, so room pressure helps hold them shut (TRS 1010, Annex 8, para 4.14). At 25 Pa, a 1.0 × 2.1 m leaf carries 52.5 N, so a door that opens against the pressure needs a closer and handle sized for it.
A sliding door needs the travel direction, the free wall beside the opening and the track or drive position. A powered door also needs its power supply, controls, maintenance access and operating sequence on the drawing.
Matching the frame to the wall
Our frame profiles are made for 50, 75 and 100 mm panel walls, and colour-steel aluminium doors for 50 and 60 mm walls. The frame sits flush with the panel face: a frame that stands proud leaves a ledge that holds dust, and EU GMP Annex 1 asks for surfaces without hard-to-clean recesses (para 4.6). For a brick or block wall, send the measured opening, the wall thickness with finishes, the floor level and photographs; see hinged cleanroom doors in brick walls.
A door vision panel is drawn on the door leaf drawing. A separate wall vision panel (observation window) needs its own opening and frame detail; see cleanroom vision panels.
Before you approve the door schedule
- Units on every dimension; passage, opening, frame and leaf labelled.
- Opening side and handing approved on a plan with the drawing revision.
- Panel thickness or masonry wall, floor level, fixing and seal agreed.
- Hardware, finish, vision panel and pressure difference stated.
- Reports the project needs listed, for the complete door assembly.
- Quantities, supply scope, packing by door mark and installation responsibility agreed.
Questions
Common questions
What is the standard size of a cleanroom door?
No cleanroom standard sets one. Our typical openings are 900 × 2100 mm single (widths 900–1200 mm), 1500 × 2100 mm double and 1200 × 2100 mm unequal leaf. Size the door for the largest item that has to pass.
What is the difference between clear passage and construction opening?
Clear passage is the usable space with the door open. The construction opening is the hole in the wall for the frame. Give both, plus the external frame size, as separate numbers with units.
What should a clean room door specification include?
Door type, the four dimensions, wall, frame, leaf face and core, vision panel, hardware, pressure across the door, any leakage class and fire rating for the full assembly, interlock group, finish and cleaning agents, and supply and installation scope.
How wide should a cleanroom door be for trolleys or equipment?
Take the width of the widest trolley, bed or machine on that route, with its load, and set the clear passage from it. An unequal-leaf door opens wide only when equipment passes.
Which way should a cleanroom door open?
WHO guidance says swing doors should normally open to the high-pressure side and have self-closers. Confirm each door against the pressure plan and the fire-escape route.
Can I use one schedule for doors and windows?
Use one layout for both, so openings are cut and framed before shipping. Give doors and windows their own marks; a wall window needs its own opening and frame detail.
What should a laboratory door specification include?
The usual cleanroom door items, plus what the biosafety level asks for. BMBL 6th edition says BSL-2 laboratory doors are self-closing with locks, and BSL-3 access is through two consecutive self-closing, lockable doors, with spaces around doors capable of being sealed for decontamination.
Related guides
- Hinged Cleanroom Doors in Brick, Block and Panel Partition Walls
- Hardwall vs softwall cleanroom: how to choose
- Automatic Sliding Cleanroom Doors: Activation, Interlocks and Specification
- Types of cleanroom doors: swing, sliding and hermetic
- Turnkey cleanroom contractor
- Room list builder
Sources
- EN 12207:2016, Windows and doors: Air permeability: Classification (EVS listing)
- EudraLex Volume 4, Annex 1: Manufacture of Sterile Medicinal Products (European Commission, 25 August 2022)
- WHO Technical Report Series No. 1010, Annex 8: Guidelines on HVAC systems for non-sterile pharmaceutical products (2018)
- CDC and NIH, Biosafety in Microbiological and Biomedical Laboratories, 6th edition (revised June 2020), Section IV, Biosafety Levels 2 and 3, Laboratory Facilities; checked 19 November 2026
- Dubai Health Authority, Health Facility Guidelines, Part C: Access, Mobility, OH&S, Version 1.0, section 6 Doors (checked 19 November 2026)
Project enquiry
Send what you have
A room list, a floor plan or only the floor area is enough to start. After you submit, send drawings by email or WhatsApp.
We reply by email within one working day. We can sign an NDA before you send drawings.
WhatsApp +44 7962 561184 is our UK number for export enquiries. The factory is in Tianjin, China.
Fastest reply: message us on WhatsApp. Or use the form, and add your WhatsApp number so we can reply there.
Email: [email protected]
WhatsApp: +44 7962 561184