ZY CleanroomTIANJIN · SINCE 2002 Get a budget range

Buyer guide

Operating theatre design in hospitals: basics, standards and HVAC

Operating theatre design starts from the order of zones: from the cleanest rooms, where sterile instruments are laid up and surgery takes place, through scrub, anaesthetic and corridor areas, to the dirty utility and the disposal route. Air always moves from the cleaner zone to the less clean one, and the pressure, air change, temperature and humidity values come from the standard named by the health authority of the hospital's country. This guide sets out the design basics, compares the values in common standards, and shows what the theatre HVAC, walls and doors need.

By ZY Cleanroom · Updated · Sources at the end of the page

Basics of hospital operating theatre design

UK HTM 03-01, an international reference used on many hospital projects, sorts the rooms of a theatre suite into four cleanliness categories: sterile, clean, transitional and dirty. The design assigns each room to one of them, and the air system keeps the flow moving from the cleaner category to the less clean one.

RoomPressure in standard layout 1 (HTM 03-01)Position in the order
Lay-up preparation room35 PaHighest: air flows from here into the theatre
Operating theatre25 Pa nominalBelow the preparation room
Scrub25 PaSame level as the theatre
Corridors and support roomsLowerAir flows out to them
Dirty utility and disposalLower; door kept closedLowest: air flows in, not out

Four routes are planned before the walls are fixed: staff (changing → clean corridor → scrub → theatre), patient (reception → anaesthetic room → theatre → recovery), clean supplies (sterile store → lay-up room → theatre), and used instruments and waste (theatre → dirty utility → disposal), kept apart from the clean supply route. See operating theatre zones.

Operating theatre design in hospitals: basics, standards and HVAC

Operating theatre layout: room sizes, height and door widths

Once the zones are set, the layout needs room sizes. UK Health Building Note 26, Facilities for surgical procedures, Volume 1 (2004), gives these figures for in-patient theatre suites. Use them as a reference and check the guidance your health authority names.

Room or elementHBN 26 figureParagraph
Operating theatre55 m², approximately square4.69, 4.70
Anaesthetic roomAt least 19 m²4.34
Preparation (lay-up) room12 to 20 m²; the larger size where organ transplant surgery takes place4.66
Scrub and gowning11 m² for one theatre; 16 m² when shared by two theatres; 7 m² as a recess inside the theatre4.54
Clear height in the theatreAt least 3,000 mm from finished floor to ceiling4.82
Doors from the corridor to the anaesthetic room and into the theatreDouble doors, at least 1,600 mm clear opening4.40
Department entranceAutomatic double door, at least 1,600 mm clear opening4.8

HBN 26 recommends the same 55 m² for every in-patient theatre, so that any theatre can take any type of surgery, including minimally invasive work, which needs the largest room (para 4.72). A scrub room shared by two theatres can upset the pressure gradients of both, so HBN 26 asks for specialist engineering advice before sharing one (para 4.54).

These figures feed the panel and ceiling drawings directly: the theatre's floor area and 3,000 mm clear height set the wall panel lengths and the ceiling grid, and the 1,600 mm openings set the door leaves and frames. We draw the wall, ceiling and door layout from your room sizes. The structure above must carry the ceiling-mounted supply units and operating lights (para 4.82), and your structural engineer confirms it.

Operating theatre design standards compared

These are design values for the theatre itself as the standards publish them. They are international reference values, not the rule in your country: check the current edition for your project, and the standard your health authority names.

StandardTotal air changesPressureAir speed at the tableTemperature and humidity
HTM 03-01 Part A (UK, 2021)22 or more per hour25 Pa nominal (standard layout 1)0.2 to 0.3 m/s at 1 m above floor18 to 25 °C, set by staff
ASHRAE/ASHE 170, Table 7-1 (US)20 total, 4 outdoorPositive, no value givenNot set in the table20 to 24 °C, 20 to 60% RH
NABH (India, 2018)20 minimum total, 4 fresh2.5 Pa minimum0.13 to 0.18 m/s21 ± 3 °C, 20 to 60% RH

China's GB 50333-2013 ranks clean operating rooms I to IV by surgery type and gives the operating zone a cleaner class than the area around it.

In Dubai, the Dubai Health Authority's Health Facility Guidelines have six parts, A to F, and Part B covers the operating unit. DHA says hold-open devices should not be fitted to doors of pressurised rooms and that sliding doors should hang from a top track with no floor track. In Saudi Arabia, the Ministry of Health's Hospital Commissioning Checklists tie facility items to CBAHI standards. We design to the standard your health authority sets.

Operating theatre HVAC design

  • An air handling unit serving the suite, sized for the room volumes and the air changes in the standard. In HTM 03-01 standard layout 1, a 165 m³ theatre takes about 1.01 m³/s total supply; size for your own room, not this example.
  • A laminar flow canopy or ceiling diffuser with terminal filters over the table. For ultra-clean ventilation in major orthopaedic work, HTM 03-01 asks for a clean zone of at least 2.8 × 2.8 m under the canopy, marked on the floor by a contrasting inlay.
  • Filter grade: HTM 03-01 lists EPA E10 to E11 as typical for ultra-clean theatre terminals; NABH asks for HEPA at 99.97% at 0.3 µm; ASHRAE 170 sets MERV 16 as the minimum and does not allow recirculation by room units.
  • Open-door protection: the pressure across an open door is lost, so the air system must give enough outward flow through open doors (HTM 03-01, para 8.18).
  • Infectious cases: HTM 03-01 allows a theatre to run at the same pressure as its corridor, with no air cascading out (para 8.125).
  • Commissioning tolerance: HTM 03-01 gives the design airflow +10% and −0% as the normal commissioning tolerance.

See laminar flow ceilings for operating rooms and modular operating theatres.

Walls, ceilings and doors

Opening or elementUsual specification
Walls and ceilingsSandwich panels with smooth steel faces, sealed joints and coved corners, easy to clean and disinfect
Theatre main entrance (bed and trolley)Hermetic sliding door, automatic
Scrub to theatreHermetic sliding or swing door, automatic or with push plates
Lay-up room to theatreSwing or sliding door, self-closing
Dirty utility and disposalSwing door, self-closing, kept closed
Vision and transferFlush observation windows and pass-through hatches

We manufacture the wall and ceiling panels and the hermetic and swing theatre doors, manual or automatic, in our factory in Tianjin. See operating theatre doors.

What we deliver for an operating suite

We design the suite and its pressure cascade from the surgery list and the standard your health authority sets, manufacture the panels, ceilings and doors, and supply the laminar flow canopy, terminal filters, air handling units, observation windows and pass-through hatches, inspected before shipping. On turnkey contracts our own crew installs the rooms and the HVAC and commissions them, in China and abroad, and we hand over the test reports and IQ/OQ documents. Medical gas and licensed electrical work is carried out by a licensed local contractor named in the contract. Your health authority approves the facility. See hospital cleanrooms and operating theatres. Chat on WhatsApp (+44 7962 561184) and send the suite plan.

Questions

Common questions

What are the basics of hospital operating theatre design?

Zones ordered from cleanest to least clean; separate routes for staff, patients, clean supplies and waste; air flowing from cleaner to less clean rooms with a pressure cascade; HVAC and filters at the values the national standard sets; and sealed, cleanable walls and doors.

How big should an operating theatre be?

HBN 26 recommends 55 m² for every in-patient operating theatre, approximately square, with at least 3,000 mm clear height. The anaesthetic room is at least 19 m² and the preparation room 12 to 20 m². Check the guidance your health authority names.

What should the air pressure be inside an operating theatre?

It depends on the standard. HTM 03-01 standard layout 1 gives 25 Pa for the theatre and 35 Pa for the lay-up room; NABH asks for at least 2.5 Pa; ASHRAE 170 asks for positive pressure without a value.

How many air changes does an operating theatre need?

20 total with 4 outdoor in ASHRAE 170, 22 or more in HTM 03-01, and 20 minimum with 4 fresh in NABH. The standard your health authority names decides.

What temperature and humidity suit an operating theatre?

ASHRAE 170 gives 20 to 24 °C and 20 to 60% RH; NABH gives 21 ± 3 °C and 20 to 60% RH; HTM 03-01 gives 18 to 25 °C, set by staff.

What doors does an operating theatre need?

An automatic hermetic sliding door at the main entrance, self-closing sliding or swing doors to scrub, lay-up and anaesthetic rooms, and a closed swing door to the dirty utility. Dubai Health Authority guidance bars hold-open devices on doors of pressurised rooms.

Related guides

Sources

Project enquiry

Send what you have

A room list, a floor plan or only the floor area is enough to start. After you submit, send drawings by email or WhatsApp.

We reply by email within one working day. We can sign an NDA before you send drawings.

WhatsApp +44 7962 561184 is our UK number for export enquiries. The factory is in Tianjin, China.

Fastest reply: message us on WhatsApp. Or use the form, and add your WhatsApp number so we can reply there.

Email: [email protected]
WhatsApp: +44 7962 561184

Step 1 of 2

Chat on WhatsAppGet a budget range