ZY CleanroomTIANJIN · SINCE 2002 Get a budget range

Country guide: Costa Rica

Cleanrooms in Costa Rica: design, construction and supply

We design and build cleanrooms for medical device plants, laboratories and pharmaceutical plants in Costa Rica. We manufacture the wall and ceiling panels, the ceilings and the doors in our factory in Tianjin, China, in production since 2002, and ship them to your site. On a turnkey contract, our own crew installs the panels, installs and commissions the air system, tests the rooms and hands over the IQ/OQ documents. Works that need a local licence are carried out by a licensed local contractor named in the contract.

By ZY Cleanroom · Updated · Sources at the end of the page

Why Costa Rica needs cleanrooms

Medical devices are Costa Rica's largest goods export. According to PROCOMER, from January to August 2025 they made up 48 percent of the country's goods exports. Assembly, moulding, final cleaning and packaging of these products take place in cleanrooms, and each line extension usually needs new or remodelled rooms.

Cleanrooms in Costa Rica: design, construction and supply

What we do in Costa Rica

ServiceWhat it covers
Design and buildLayout, pressure cascade, air balance, construction and handover in one contract
Modular cleanroomsFactory-made panels, doors and ceilings, numbered for site assembly
Remodelling and extensionUpgrading or extending an existing room without stopping the rooms next to it, starting from a survey
Supply onlyPanels, doors, ceilings and air equipment for your contractor

Which rules apply to your facility

Cleanliness class. The air class is defined by ISO 14644-1:2015. For particles of 0.5 µm and larger, ISO 7 allows 352,000 per m³ and ISO 8 allows 3,520,000 per m³. Design and construction follow ISO 14644-4:2022.

Medical devices. The maker's quality system usually follows ISO 13485, and the customer buying the device sets the class of each room in its specification. Before you ask for quotations, put these data in a room list; see ISO 13485 cleanroom requirements.

Medicines. In Central America, the technical regulation on good manufacturing practice for the pharmaceutical industry is RTCA 11.03.42:07, approved by COMIECO Resolution 339-2014 of 25 April 2014. In Costa Rica the authority is the Ministry of Health. Ask the Ministry how the regulation in force applies to your plant before you fix the design. For GMP grades, see GMP grades A to D and ISO classes.

The authority approves the owner's facility, not the contractor. The owner should therefore agree from the start which design, test and qualification documents the inspection will need.

Typical classes by room

RoomTypical class
Medical device assemblyISO 7 to ISO 8
Injection moulding of partsISO 7 to ISO 8
Sterile barrier packagingISO 7 to ISO 8
Gowning roomISO 7 to ISO 8

These are starting points, confirmed with your process, your product and your customer.

How the materials arrive

Panels, doors and ceilings are cut to size, numbered to the assembly drawing and packed for containers. You choose the delivery term in the quotation. If you want the load checked, you can appoint the inspection company you prefer before shipment. See how to import a cleanroom from China.

What to send for your quotation

  • Plan or sketch of the building with dimensions and clear height
  • Room list with area, ISO class and occupancy state (at rest or in operation)
  • Process in each room and main equipment
  • Scope: turnkey, design and supply, or supply only

Message us on WhatsApp at +44 7962 561184 or use the form. We can sign a confidentiality agreement before you send drawings.

Who does the site work

On a turnkey contract, our own crew installs the panels, doors and ceilings, installs the air system and commissions the rooms. Works that need a local licence, and the permits for them, are carried out by a licensed local contractor named in the contract.

On a design-and-supply or supply-only order, your contractor installs with our numbered drawings and installation guide, and we support the site team by video from set-out to the first panels. On-site supervision can be arranged for larger projects, and installer training can be included in the scope.

Rooms are tested against the agreed class before handover, and we hand over the test reports and IQ/OQ documents. Independent third-party testing can be arranged.

The site steps, from arrival and set-out to commissioning and handover, are set out in our guide to cleanroom installation abroad.

Questions

Common questions

Do you build cleanrooms in Costa Rica?

Yes. We design, manufacture the panels and doors, ship, and on a turnkey contract our crew installs and commissions the rooms. Works that need a local licence are carried out by a local contractor named in the contract.

Which class does a medical device cleanroom need?

Often ISO 7 or ISO 8, depending on the product and patient contact. The final class is set by your specification and your customer.

Can you extend a cleanroom that is already running?

Yes. We start from a survey of the existing room and plan the work to keep the new area apart from the area in production. See cleanroom remodelling.

Who qualifies the rooms?

On a turnkey contract we hand over the IQ/OQ documents. Performance qualification and process validation belong to the owner.

Do you sell the panels only?

Yes. On a supply-only order we ship panels, doors, ceilings and air equipment with assembly drawings for your contractor.

Related guides

Sources

Project enquiry

Send what you have

A room list, a floor plan or only the floor area is enough to start. After you submit, send drawings by email or WhatsApp.

We reply by email within one working day. We can sign an NDA before you send drawings.

WhatsApp +44 7962 561184 is our UK number for export enquiries. The factory is in Tianjin, China.

Fastest reply: message us on WhatsApp. Or use the form, and add your WhatsApp number so we can reply there.

Email: [email protected]
WhatsApp: +44 7962 561184

Step 1 of 2

Chat on WhatsAppGet a budget range